Small format housing development — a cluster of detached small homes around a shared green in Madison, Wisconsin
Small Format Housing

Small Format Housing.
Site Plan to Certificate
of Occupancy.

We develop communities of small detached homes — cottage courts, pocket neighborhoods, workforce housing, and infill. Site planning, master planning, architecture, municipal coordination, and construction, delivered by one team accountable for the whole project.

Why Us

The same discipline,
at the scale of a neighborhood.

We built our reputation on one thing: getting a single small home permitted and built on a single lot in Dane County, where the zoning is unforgiving and the approval path is different in every municipality. That work forced us to learn site constraints, utility routing, setback math, and the specific people who sign the permits.

Small format housing is that same discipline applied to eight homes instead of one. The site is bigger and the approvals are harder, but the underlying problem is identical — and it's a problem most developers hand to three different consultants who don't talk to each other.

Same team. Same builders. Larger scope.

What We Do
Single-Lot ADUs
Detached, attached, and garage ADUs for homeowners across Madison and Dane County — the work we're known for.
Small Format Housing
Multi-home development — cottage courts, pocket neighborhoods, workforce housing, and infill sites. Planning through delivery.
Full Scope

We handle all of it.

Most small format projects die between the feasibility sketch and the first permit — not because the idea was wrong, but because nobody owned the middle. We take the site from raw parcel to occupied homes without handing you off between five consultants who don't talk to each other.

01
Feasibility & Site Analysis

Parcel review, zoning district analysis, buildable-area math, utility capacity, easements, topography, and tree canopy. You get a straight answer on unit count before you spend money on design.

02
Site Planning

Unit placement, shared open space, parking and drive aisles, stormwater, pedestrian circulation, and setback compliance — drawn to the standard your municipality's staff actually reviews.

03
Master Planning

Phasing strategy, unit mix, density targets, and long-term buildout for larger parcels. Designed so phase one can stand on its own if phase two takes longer than planned.

04
Architecture & Unit Design

Home design drawn from our production model library or designed from scratch. Repeatable plans keep cost predictable; varied elevations keep the development from reading as a subdivision.

05
Municipal Coordination

Pre-application meetings, staff review, conditional use permits, plan commission and council hearings, and neighborhood meetings. It also means making the case for infrastructure cost participation — TIF, fee waivers, or shared improvements — because that conversation sets the final price of every home.

06
Construction & Delivery

Site work, utilities, foundations, and vertical construction through certificate of occupancy — built by the same crews that build our single-lot ADUs.

Process

How a development
actually moves.

Six phases from first conversation to occupied homes. Timelines vary by municipality — the sequence does not.

PHASE 01
Feasibility

We pull the zoning, the parcel data, and the utility records, then tell you how many units the site supports and what approval path each option requires. If the answer is "this site doesn't work," you hear it here — not after design fees.

PHASE 02
Concept Site Plan

Unit placement, circulation, open space, and parking laid out to scale against real setbacks and lot coverage limits. This is the drawing you take into a pre-application meeting with planning staff.

PHASE 03
Municipal Pre-Application

We meet with planning, zoning, engineering, and fire before anything is formally submitted. Staff tell you their concerns in that meeting; addressing them before submittal is what keeps a project from cycling through three rounds of review.

PHASE 04
Entitlements & Approvals

Formal site plan submittal, conditional use permit if required, neighborhood meeting, plan commission, and council. We prepare the materials, present, and negotiate conditions.

PHASE 05
Construction Documents & Permits

Full construction drawings, structural and energy compliance, civil and utility coordination, and building permit issuance for each unit.

PHASE 06
Construction & Occupancy

Site work and utilities, then vertical construction — phased so early units can reach occupancy while later ones are still framing. Delivered to certificate of occupancy.

The Case

Why small format,
and why now.

Dane County's housing shortage is concentrated in exactly the product type that conventional development stopped building: detached homes under 1,000 square feet on small lots. The zoning has moved. The product hasn't caught up — and the municipalities that pair the zoning change with real infrastructure support are the ones that will actually see these homes get built, at a price their residents can pay.

2–8
Detached homes on a single lot under Madison's cottage court ordinance
21
Dane County municipalities whose ADU and small-home rules we track continuously
One
Team accountable from site analysis through certificate of occupancy
17
Production home plans available as a starting point for unit design
Who We Work With

Landowners, developers,
and communities.

Landowners

You own a parcel that's too big for one house and too small for a subdivision. We tell you what it can actually hold and whether developing it beats selling it.

Developers & Investors

You have capital and a site but no small-format delivery capability. We handle entitlement and construction; you keep the ownership structure you want.

Municipalities & Nonprofits

You have surplus land, a housing mandate, or tax-delinquent infill parcels — and the infrastructure lever that sets the final price. Cities that help carry site infrastructure get homes their workforce can afford; cities that only change the zoning usually get nothing built.

Employers

You can't hire because your people can't find housing within thirty minutes of the job. Employer-sponsored small format housing is a faster fix than waiting for the market.

Faith & Institutional Landowners

Churches, schools, and institutions sitting on underused parking or lawn. Small format housing converts that acreage into mission-aligned housing and recurring revenue.

Family Landholders

Multi-generational property that needs a plan. We design clusters that keep family on the land while adding units that carry the cost.

Common Questions

Questions we get first.

How small a site can support a small format development?+
Under Madison's cottage court ordinance, a standard residential lot can often support three to five detached homes depending on lot width, depth, and coverage limits. Below roughly 10,000 square feet the shared-open-space requirement starts to control the unit count. We give you the specific number for your parcel during feasibility.
Do you develop your own projects or work on ours?+
Both. We develop projects directly and also work as the planning, design, and construction partner on projects owned by others. The engagement structure is set at feasibility — some clients want a fee-based development services agreement, others want us to take an ownership position.
How long does entitlement take in Dane County?+
It depends heavily on the municipality and whether a conditional use permit is required. A by-right site plan approval in Madison can move in a couple of months. A conditional use with a neighborhood meeting and plan commission hearing typically runs longer. We give you a municipality-specific schedule during feasibility rather than a generic range.
Are these homes for sale or for rent?+
Either. Small format developments can be structured as rental communities under single ownership, as condominium or platted for-sale units, or as a mix. The ownership structure affects the site plan and the financing, so it's a decision we make early rather than late.
Do you build outside Dane County?+
Our depth is in Dane County, where we track ADU and small-home regulations across 21 municipalities and know the staff at most of them. We evaluate projects elsewhere in south-central Wisconsin case by case — the further from Madison, the more the entitlement timeline becomes an unknown.
Do these projects need municipal incentives to work?+
They need municipal participation to reach the prices people actually need. Small format design does a lot on its own — sharing land and infrastructure across more homes is the biggest cost lever there is. But site infrastructure is a real hard cost, and whoever carries it determines the final price. A city that funds or waives part of it lowers the cost basis of every home on the site, dollar for dollar, and avoids the interest and return expectation that get layered on top of privately financed dollars. Zoning reform makes these homes legal; infrastructure support is what makes them affordable. The municipalities that do both are going to be well ahead of the ones that stop at rezoning.
What does a feasibility study cost?+
The initial site conversation and preliminary zoning review are free. A full feasibility package — buildable area analysis, unit count, concept site plan, approval path, and preliminary cost model — is a fixed fee that varies with parcel complexity. We quote it after the first call.
Have a Site in Mind?

Find out what your parcel can hold

Send us the address. We'll pull the zoning, run the buildable-area math, and tell you how many homes the site supports and what it takes to get them approved — before you spend anything on design.

Start a Site Feasibility Review →